亚洲最大输电线路杆塔试验站液压加荷系统
The hydraulic loading system used in Asia's largest electric transmission column tower laboratory.

  国电电力建设研究所1000KV杆塔试验站是目前亚洲最大的输电线路杆塔试验站,该液压系统由分布在三个不同位置的PLC和上位测控计算机组成网络进行远距离协调控制。系统运行过程中,下位PLC把现场传感器采集到的参数、报警信号和开关量状态上传测控计算机,通过伺服比例阀和伺服油缸对被试杆塔各受力点的加荷进行闭环控制,并由计算机测控。
  The 1000KV column tower laboratory developed by the Electric Construction Institute of the National Electric Power Company is the current largest electric transmission column tower laboratory in Asia. The hydraulic system utilizes a network comprising three PLCs at different positions and upper monitor computer to implement long-distance coordination and control. During the system operation, the lower PLC transmits the parameters, alarm signals and switching status picked up by field sensors to the monitor computer to carry out closed loop control over all bearing points of the tested column towers by way of servo proportionate valves and servo hydraulic cylinders, which will be monitored by computer.

   设为首页 | 加入收藏 | 联系我们 | 友情链接 | English
 版权所有:四川长江液压件有限责任公司 地址:四川泸州市江阳区茜草西路
 邮编:646006 电话:0830-3582812 传真:0830-3580325